ABOUT EVENT EVENT SCHEDULE REGISTER ME PAPER PROPOSAL SPEAKER PROFILES ENQUIRY
This Event is closed. Please visit home page for other relevent events www.cmtevents.com.
Day 1 - [05 Nov, 2009 - Thursday]

Assessing CBM and Managing Co-Produced Water Resources

Conducted by Dr Romeo Flores - CBM Expert

09:00
CBM Basics and U.S. Models
- Overview types and origin of CBM
- Impact of conflicting ownership of CBM between coal and gas industries in U.S.
- Review U.S. CBM models producing from various coal rank and compare field properties
- Geological and hydrological factors relevant to CBM assessment
Romeo M Flores,
US Geological Survey
10:30
Questions followed by Coffee
11:00
Methodologies of CBM Assessment
- Coring methods for assessing coal reservoir properties and gas volume
- Gas content measurement using direct and indirect methods for assessing gas-in-
place resources
- High-pressure methane adsorption method for assessing gas holding capacity and saturation of coal reservoir
- CBM resource assessment (estimation) methodology without and with CBM production wells (gas-in place versus estimate of ultimate recovery or EUR)
- CBM reservoir properties
- Two-phase gas and water flow with dewatering CBM wells
Romeo M Flores,
US Geological Survey
12:00
Discussions followed by Lunch
14:00
B. Methods of Managing CBM Co-Produced Water
- Assessing the significance of the volume of co-produced water from producing CBM wells
- Analyzing the quality and classification of co-produced water
- Impact of environmental regulations of co-produced water to CBM development and well spacing
- Methods of surface and subsurface disposal of co-produced water: pros a and cons, as well as economically viable alternatives of disposal
- Concerns and issues relating to management of co-produced water
Romeo M Flores,
US Geological Survey
15:00
Discussion followed by Tea
16:00
C. Summary: Why it is Necessary to Dewater (Co-Produced Water) to Produce Unconventional Gas Like CBM!
Project Sharing Experiences among delegates
Romeo M Flores,
US Geological Survey
17:00
End of Day 1
Day 2 - [06 Nov, 2009 - Friday]
08:55
Effective Methods Of CBM Drilling & Completion

 

CBM Drilling and Completion methods of successful coal seam methane projects vary widely. It is important to understand the pros and cons of the different techniques in order to select the best procedures. This course discusses how to drill and complete CBM wells.

 

Specific topics to be covered

 

- Basics of a Successful Gas Drainage or Production Drilling Program

 

- Well Planning

 

- Suitable Rigs

 

- Drilling Practices

 

- Vertical Drilling

 

- Horizontal Directional Drilling

 

- Lateral and Multilateral Drilling

 

- Completion Types and Design

 

- Completion Treatments (Job Pumping)

 

- How to apply these Technologies Including Recent Case Studies on How Horizontal/Directional Drilling has Improved Production Potential

 

Mr. Doug Henderson, Manager Engineering Services-Drilling Services Div
Lucas Group Ltd
12:30
Discussion followed by Lunch
14:00
Close of Conference

Promotion opportunities

Sponsor this event

Promotion Partner(s)